Workshop visits by appointment · Kenley, Surrey

What Happens To Listed Buildings On The Heritage At Risk Register?

What Happens To Listed Buildings On The Heritage At Risk Register?

The blessing and to some degree the curse of owning a listed building is that you are a custodian to a piece of living history, one that has seen generations of lives pass through it and remained a constant in an ever-changing world.

The problem with that change is that time can sometimes wear and dull once-youthful features, and these design elements can be more difficult to fix as historic skills are replaced with more efficient modern building materials and methodologies.

This is where working with restorers who understand the needs of listed buildings is absolutely essential, and the results can be truly astonishing and awe-inspiring.

However, it is important to get in touch and start planning restoration work as soon as you feel it is necessary, to ensure that the work is minimally invasive and avoid the risk of your building being at risk of irreparable damage.

This is something that Historic England’sHeritage At Risk Register aims to fix each year, but how do buildings end up on it? What happens to these buildings? And what steps are typically taken to exit the register?

What Does The Heritage At Risk Register Mean For Listed Buildings?

The Heritage At Risk Register is anannual survey of listed buildings, structures and other areas of historical interest (battlefields, gardens, wreck sites and conservation areas), which are deemed to be at risk of falling into a state where they are vulnerable to damage, defacing or deterioration.

Historic England hasstrict criteria for the types of buildings that would qualify to fit on the At Risk Register, based around the different levels of deterioration and risk for varying types of heritage sites, but for buildings, the criteria for registration typically include:

  • Listed Building Grade – In general, only Grade I and Grade II* listed buildings qualify for the At Risk register unless they are based in London or are places of worship.

  • Condition – This is assessed on a scale from ‘very bad’ through ‘poor’, ‘fair’ or ‘good’. Buildings in good condition tend not to be on the register unless they are at risk of deteriorating quickly.

  • Occupation or Use – Historic England follows the principle that buildings that are either being lived in or actively used are more likely to be protected and maintained over time. This is graded on a scale from ‘vacant’ through ‘part-occupied’, ‘occupied’, ‘not applicable’ (for structures) and ‘unknown’.

  • Vulnerability – In general, the vulnerability of the site and the risks of it getting worse are rated as either ‘high’, ‘medium’ or ‘low’, with ‘unknown’ used for buildings where the health of the building cannot be truly ascertained. 

  • Trend – This is the determination for whether the building’s status is ‘declining’, ‘stable’, ‘improving’ or ‘unknown’, with the latter describing buildings with complex needs which cannot be as yet determined.

What Happens When A Listed Building Is On The At Risk Register?

When a listed building is added to the At Risk Register, a lot of different positive steps are often undertaken quickly. Acase priority category is assigned, Historic England assigns someone to focus on this particular building and steps begin to be taken to help resolve the problems with the building.

This usually means surveys being carried out on the building’s management and current condition, working with local heritage organisations and other stakeholders and grants to fund urgent issues and place a building in the right position to be sustained in the long term.

How Does A Listed Building Get Removed From The At Risk Register?

In general, when a listed building is no longer at risk of deteriorating quickly, it is typically removed from the following year’s At Risk Register. 

However, to avoid the risk of buildings bouncing on and off the list, an At Risk building stays on the Register despite its condition if it has been repaired, but there are no implemented plans for its reuse until any plans are implemented and completed.

Usually, this involves a complete repair plan and either the building being mostly occupied, used, or having been adopted by an appropriate listed building management structure that can ensure that it is no longer vulnerable.

This is why some of the buildings on the At Risk Register appear to be in good condition; they are waiting for occupation to ensure that their long-term future is assured.

Other than this, At Risk buildings can be removed from the register if they have been demolished or are in a state that is beyond repair. The latter is sometimes the result of buildings which cannot be justifiably repaired, usually because the cost of restoration is far more than the value of the building.

Explore our cornice collection and ceiling roses, or read about our traditional lath & plaster and restoration services.

Talk to the specialists

Questions about your own plasterwork? We’re happy to advise.

Contact Ovolo London